Ordering a soundproof karaoke door from another country takes more than picking a finish from a photo. The supplier needs to know your wall opening, your acoustic target and how the room will be used. This guide explains what to prepare so quotes can be compared on the same basis. For the door styles themselves, see our soundproof door range.
Read the acoustic rating carefully
STC and Rw are related, but not identical
STC (Sound Transmission Class, ASTM E413) is common in North America. Rw (ISO 717-1) is used in Europe and many other markets. Both summarise airborne sound reduction in one number, but they cover different frequency ranges and follow different calculation rules. Do not treat one as an exact conversion of the other.
Ask what was actually tested
A higher number means better isolation under the test conditions. Ask whether the report covers the complete door set (leaf, frame, glass, hardware and seals) or only a core material or glass pane. Check the specimen size, laboratory and report number. If no report is available, treat any figure as unverified.
Laboratory results do not guarantee on-site performance. Gaps, an uneven floor or sound travelling through walls and ceilings can lower the result. STC also starts at 125 Hz, so it says little about the deepest bass in a karaoke room. These notes are for reference (updated 28 November 2026); confirm project requirements with your acoustic consultant and the relevant authority.
Measurements and drawings to send
- Width and height of each opening, measured at several points, plus wall thickness including finishes.
- Finished floor level, threshold condition and any slope. Say if flooring is not yet installed.
- Swing direction, single or double leaf, and nearby walls, steps or switches.
- Photos from both sides and a floor plan with every door numbered.
Early karaoke design drawings help fix door positions before wall finishes are ordered. Confirm too that the clear opening lets sofas and karaoke tables pass through.

Specify the whole door set
Put these items in writing: leaf build-up and core, frame material, perimeter seals, bottom seal or threshold, vision panel glazing, hinges, handle, closer and surface finish. This makes it easier to see why two offers differ. Our article on karaoke room soundproofing for doors, walls and ceilings explains how the door works together with the rest of the room.
Fire resistance is a separate property. An acoustic rating does not prove a fire rating, so check local rules for each location and read about fire-rated doors for karaoke venues. Exit doors and escape hardware must follow the approved safety design.

Checks before shipping and after installation
Before production, approve a drawing and a finish sample. Before shipping, ask for photos or video of each numbered door, a packing list and details of crate protection. Agree who handles freight, import duties, on-site fitting and replacement parts. Check that lifts, stairs and corridors can take the crated door.
During karaoke construction, make sure the frame is plumb and square and the joint between frame and wall is fully sealed. Close the door and look for uneven contact along the seals. Then play music at a normal operating level and listen around the edges and in the corridor. This simple check can reveal leaks, but it is not a certified STC or Rw measurement.
FAQ
What STC rating does a karaoke door need?
There is no single figure for every venue. It depends on music level, neighbouring spaces, walls and local noise limits. Set the target for the whole room, then choose the door.
Can I order using only the door width and height?
It is not enough for production. Send wall thickness, floor details, swing direction, photos and drawings as well.
Does a thicker door always block more sound?
No. The layer build-up, mass, seals, glazing and installation all matter. Compare complete door sets and their test evidence.
Is a double door better for a loud room?
Two separate doors with a small lobby can help where space allows. A double-leaf door is different: it is one opening with two leaves and a meeting gap that must be sealed.
Should I order doors before the walls are finished?
You can agree the design early. Release production only after opening sizes and finished levels are confirmed, either measured on site or fixed in approved drawings.
Related: karaoke design - karaoke construction - soundproof door - karaoke tables